Cobra 850
New Prop & Batteries 2017
- Boat REF# · 246713
- LOA · 8.69m
- Year · 1977
- Construction · GRP
- Underwater profile · Fin
- Berths · 5
- Engine · 1 x Diesel 25hp, Beta (2005)
- Lying · Near Plymouth, Devon, UK (by appointment only)
This boat is off the market but here are some boats that are still For Sale
Extra Details
Designer | David Feltham |
---|---|
Builder | Cobra Yachts (UK) |
Lying | Near Plymouth, Devon, UK (by appointment only) |
Fuel capacity | 50.0 ltr Total - 1 Tanks |
Water capacity | 50.0 ltr Total - 1 Tanks |
Last survey | 06/05/2015 |
Mechanical
Engine | 1 x Diesel 25hp |
---|---|
Engine make and model | Beta (2005) |
Engine Hours | Not Recorded |
Engine Cooled | Indirect |
Steering | Tiller |
Drive | Shaft |
Prop(s) | 3 Blade Fixed |
Fuel consumption (approx) | Not Recorded |
Cruising speed (approx) | 6 knots |
Max speed (approx) | 7 knots |
Engine spares |
---|
Rudder stripped and rebuilt 2015
New Propeller 2017
2 x New Batteries 2017
Dimensions
LOA | 8.69m |
---|---|
LWL | 6.71m |
Beam | 2.90m |
Draft Min | 1.30m |
Draft Max | 1.30m |
Displacement | 3,515kg |
Headroom | 1.83m |
Storage | Ashore |
Rig
Sloop rigged Aluminium spars () with stainless steel standing rigging (2016)
Sails
Mainsail | Dolphin - Slab () Stack Pack, Lazy Jacks, 3 Reefs |
---|---|
Headsail | Dolphin - Furling () |
Other sails | Cruising Chute () |
2016 cap shrouds, backstay and forestay in 6mm
2016 upper shroud chain plates strengthened.
2010 lower shrouds and bottle screws replaced
New mast ring fitted to run lines aft
Electrical Systems
12 volt battery, 2 batteries charged by: engine
Construction
Construction | GRP |
---|---|
Underwater profile | Fin |
Finish | Gelcoat finish |
Stainless Steel Fuel Tank
2016 Rudder rebuilt
2017 Hull polished
Fuel & water capacity approximate
Accommodation
Total # of berths | 5 |
---|---|
No. of double berths | 2 |
No. of single berths | 1 |
Cabin(s) | 2 |
Handbasin | 1 |
Heads | 1 heads (Sea Toilet) |
Gas Certificate 2016
Toilet serviced 2015
2 burner gas cooker/stove
Accommodation
Cooker/stove | |
---|---|
Grill | |
Sink | |
Curtains | |
Manual water system | |
Fresh water wash | |
Non-Smokers |
Gas Certificate 2016
Toilet serviced 2015
2 burner gas cooker/stove
Deck Gear
Sail cover | |
---|---|
Sprayhood | |
Spray dodgers | |
Warps | |
Fenders | |
Boathook | |
Swim Ladder | |
Instrument Covers |
4 halyard winches
2 sheet winches
2 anchors
(Plough & Fishermans)
30.00m of chain
20.00m of warp
Sprayhood needs new windows
2015 New guard wires
2016 New anchor chain
Nav Equipment
Compass | |
---|---|
Speed | |
Log | |
VHF | |
Autopilot | |
Navigation lights | |
Echo sounder | |
Radar Reflector |
Plastimo Contest Compass
Nasa VHF
Tiller Pilot 300C
Wiring to mast lights needs repair at mast foot
Safety Equipment
Life buoys | |
---|---|
Safety harnesses | |
Boarding ladder |
2 bilge pumps (1 manual / 1 Electric)
2017 New electric bilge pump
2016 Gas safety check
Broker's Comments
The popular Cobra 850 cruising yacht has a reputation for being safe, seaworthy and easy to handle. Offering good sized accommodation, easy to move around decks and a roomy cockpit, they are a firm family favourite.
This example benefits from a new Beta engine fitted in 2005, a new stem head furler fitted in 2016 and a stackpack and lazy jacks fitted 2017. The standing rigging was also renewed where necessary in 2016.
With all the expensive renewals already carried out, she just needs a bit of tlc to get her looking her best.
Well worth looking at for a cost-effective way of getting your family and friends out on the water this season.
These boat details are subject to contract.
Note: Offers on the asking price may be considered.